Recent
Roofs.
Every job documented top to bottom — before, during, after. We send these photos to every customer with the final invoice.
Full re-roof — Edwardian semi.
Stripped to the rafters, new breathable membrane, treated battens, hand-cut lead valleys, ridge tiles bedded in dry-fix. Three weeks start to finish, scaffold gone the morning after.
Full re-roof — pitched, slate-effect tiles
EPDM flat roof — no drips since
Lead flashing replaced on chimney stack
Storm-damaged ridge tiles bedded back
New felt & battens before tiling
GRP fibreglass on a garage roof
Gutter clear, refixed and flushed
Let's get up there.
Free survey, free quote in writing, no pressure. We'll tell you if the roof's got another decade in it before suggesting a re-roof.